HPLC Gradient Mobile Phase Calculator
Set the flow rate and gradient program, then press Run to calculate mobile phase A and B volumes. Move the time slider to view consumption during the run.
1. Gradient Conditions
Gradient Program
Set the time (min) and solvent B (%). Solvent A = 100 − solvent B. Composition changes linearly between points.
2. Required Mobile Phase
Total required: —
Run time: —
A / B: —
3. Gradient Curve
The vertical line marks the selected time. Drag the slider or tap the graph to inspect solvent consumption for one run.
Composition at selected time: —
Total consumed: —
How Does the Mobile Phase Calculator Work?
At constant flow rate F (mL/min), total consumption at time t is F × t. Solvent B consumption for each linear gradient segment is calculated using the average %B; solvent A is the remaining volume.
Solvent B (mL) = Σ [F × (t₂ − t₁) × (%B₁ + %B₂) / 200].
Solvent A (mL) = total volume − solvent B volume.
The required volumes include the number of runs and extra solvent percentage. The time slider shows consumption for one run without extra solvent. Include re-equilibration in the gradient if needed; purging, priming and reservoir dead volumes are not modeled separately.